methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration of Design Charrette with its method-specific working model.
Innovation
Design Charrette
Paper illustration of the Lotus Blossom working structure.
Innovation
Lotus Blossom
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.In a tightly timed design process with many participants, the method pools several lines of thinking in a short time. It brings parallel design energy without letting the discussion tip into endless coordination. This quickly produces solid directions for architecture or space.When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumMediumLowLow
Timedifferent
45-60 minHalber Tag bis mehrere Tage45-90 min60-90 min
Participantsdifferent
2-810-503-104-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Assumption map, Test backlog, Risk rankingSketches and Concepts, Consolidated Solution Sketch, Prioritized DirectionLotus Diagram, Idea Themes, ShortlistAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
AssumptionsRiskExperimentsValidation
BrainstormingWorkshopCollaborationIdeation
BrainstormingIdeationCreativityDivergenceWorkshop
RiskArchitectureWorkshopValidation
Add more methods