Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
MediumHighLowLow
Timedifferent
45-60 min90-180 min20–45 min30-60 min
Participantsdifferent
2-83-8Small cross-functional group3-10
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Assumption map, Test backlog, Risk rankingCoD Table, Prioritization SequenceRisk list, Mitigation plan, Assumption logRisk Matrix, Top Risk List
Tagsno overlap
AssumptionsRiskExperimentsValidation
PrioritizationDeliveryEconomicsDecision
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
Add more methods