View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:ARID (Active Reviews for Intermediate Designs)Risk StormingBusiness Model Stress TestAssumption Mapping
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Architecture Risk Storming | ![]() Business Strategy Business Model Stress Test | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | A Business Model Stress Test checks how well a business model holds up under pressure and headwinds. It compares strengths, risks, market logic, and courses of action. The result is captured as a stress-test report and action plan per scenario. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Medium | Low | High | Medium |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | 60-90 min | Half day | 45-60 min |
Participantsdifferent | Designers, developers as users, and facilitation | 4-12 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Annotated Diagram, Prioritized Risk List, Action Backlog | Stress Test Report, Action Plan per Scenario | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | RiskArchitectureWorkshopValidation | StrategyBusiness modelRiskDiagnosis | AssumptionsRiskExperimentsValidation |



