View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
Selected:ARID (Active Reviews for Intermediate Designs)RAID LogAssumption SurfacingATAM (Architecture Tradeoff Analysis Method)
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Delivery RAID Log | ![]() Decision Making Assumption Surfacing | ![]() Architecture ATAM (Architecture Tradeoff Analysis Method) |
|---|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation. |
Complexitydifferent | Medium | Low | Low | High |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | 30 min Setup, dann laufend | 45-90 min | Several meetings plus preparation and analysis; total effort depends on scope |
Participantsdifferent | Designers, developers as users, and facilitation | 1-3 maintaining, briefing for everyone | 2-8 | Evaluation team, architects, and relevant stakeholders |
Formatdifferent | Workshop + async | Async | Workshop + async | Workshop + async |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | RAID Log, Status Report Source | Assumption List, Critical Assumptions, Learning Plan | Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | RiskTrackingStakeholdersGovernance | AssumptionsRiskDecisionDiscovery | ArchitectureQualityRiskTradeoffsStakeholders |



