methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of a Lean Canvas with nine fields, notes, and one highlighted learning risk.
Product Strategy
Lean Canvas
Paper illustration of Business Model Stress Test with its method-specific working model.
Business Strategy
Business Model Stress Test
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.When an early product bet still has too many open points, it brings target group, problem, and assumptions into a single view. It condenses the idea so core risks become nameable.A Business Model Stress Test checks how well a business model holds up under pressure and headwinds. It compares strengths, risks, market logic, and courses of action. The result is captured as a stress-test report and action plan per scenario.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumMediumHighLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional45-90 minHalf day60-90 min
Participantsdifferent
Designers, developers as users, and facilitation1-63-84-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsLean Canvas, Core Assumptions, Experiment BacklogStress Test Report, Action Plan per ScenarioAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
StartupLeanAssumptionsBusiness model
StrategyBusiness modelRiskDiagnosis
RiskArchitectureWorkshopValidation
Add more methods