methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumLowLowLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional60-90 min15-30 min60-90 min
Participantsdifferent
Designers, developers as users, and facilitation4-102-64-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsProblem Cluster, Prioritized Challenge, ExperimentRoot cause notes, CountermeasuresAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
RiskArchitectureWorkshopValidation
Add more methods