methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration of Value Chain Analysis with its method-specific working model.
Business Strategy
Value Chain Analysis
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.Value Chain Analysis shows where value is created, costs accrue, and differentiation becomes possible along the process. It compares strengths, risks, market logic, and courses of action. The result is captured as a value-chain map and lever list.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumMediumHighLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional45-60 minHalf day60-90 min
Participantsdifferent
Designers, developers as users, and facilitation2-83-84-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsAssumption map, Test backlog, Risk rankingValue Chain Map, Lever ListAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
AssumptionsRiskExperimentsValidation
StrategyBusiness modelDiagnosisAnalysis
RiskArchitectureWorkshopValidation
Add more methods