methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumLowMediumLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional15-45 min45-60 min60-90 min
Participantsdifferent
Designers, developers as users, and facilitation1-32-84-12
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsADR File, Decision Log, RationaleAssumption map, Test backlog, Risk rankingAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
ArchitectureRationaleDocumentationGovernance
AssumptionsRiskExperimentsValidation
RiskArchitectureWorkshopValidation
Add more methods