methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of a team retrospective with three separate Start, Stop, and Continue areas and a shared action list.
Agile
Start Stop Continue
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.When a sprint should not only be assessed but also learned from, it captures experience in clear learning categories. It records what worked, what's missing, and what should run differently next time.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood.
Complexitydifferent
MediumLowLowLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional45–75 min60-90 min30-60 min
Participantsdifferent
Designers, developers as users, and facilitationTeam members involved4-123-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions4Ls Board, Learning Themes, Improvement ActionsAnnotated Diagram, Prioritized Risk List, Action BacklogStart Stop Continue Board, Improvement Actions
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
RetrospectiveLearningReflectionTeam
RiskArchitectureWorkshopValidation
RetrospectiveImprovementTeamReflection
Add more methods