methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for DACI
Decision Making
DACI
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowLowHigh
Timedifferent
1-2 Tage30 min Setup, dann laufend30-60 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-41-3 maintaining, briefing for everyone2-10Evaluation team, architects, and relevant stakeholders
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Architecture Document, Context View, Runtime View, Deployment ViewRAID Log, Status Report SourceDACI Matrix, Decision Owner, Decision LogPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
ArchitectureDocumentationCommunication
RiskTrackingStakeholdersGovernance
DecisionRolesGovernanceAlignment
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods