methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
LowLowLowMedium
Timedifferent
1-2 Tage10-20 min daily60-90 min45-60 min
Participantsdifferent
1-414-122-8
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop + async
Outputdifferent
Architecture Document, Context View, Runtime View, Deployment ViewDaily Plan, Time Estimates, Review NotesAnnotated Diagram, Prioritized Risk List, Action BacklogAssumption map, Test backlog, Risk ranking
Tagsno overlap
ArchitectureDocumentationCommunication
PlanningTime managementProductivityOperations
RiskArchitectureWorkshopValidation
AssumptionsRiskExperimentsValidation
Add more methods