methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration for DMAIC.
Operations
DMAIC
Purposedifferent
With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.
Complexitydifferent
LowMediumMediumHigh
Timedifferent
10-20 min daily1-3 h0.5-5 Tage2-12 Wochen
Participantsdifferent
12-64-103-10
Formatdifferent
AsyncWorkshopWorkshopWorkshop + async
Outputdifferent
Daily Plan, Time Estimates, Review NotesStandard Work Sheet, Deviation List, Improved Standard, Training NeedsKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateProject Charter, Measurement Plan, Cause Analysis, Control Plan
Tagsno overlap
PlanningTime managementProductivityOperations
LeanProcessQuality
LeanContinuous improvementOperations
Continuous improvementQualityProcess improvement
Add more methods