View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ALPEN Method | ![]() Decision Making Pre-Mortem | ![]() Operations 5 Whys | ![]() Operations Kepner-Tregoe |
|---|---|---|---|---|
Purposedifferent | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. |
Complexitydifferent | Low | Low | Low | High |
Timedifferent | 10-20 min daily | 20–45 min | 15-30 min | 2-8 h |
Participantsdifferent | 1 | Small cross-functional group | 2-6 | 2-8 |
Formatdifferent | Async | Workshop | Workshop | Workshop + async |
Outputdifferent | Daily Plan, Time Estimates, Review Notes | Risk list, Mitigation plan, Assumption log | Root cause notes, Countermeasures | Problem Analysis, Decision Analysis, Risk Plan |
Tagsno overlap | PlanningTime managementProductivityOperations | RiskDecisionFailurePlanning | Root causeIncidentLeanProblem solving | Problem solvingRoot causeDecisionOperations |