View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ALPEN Method | ![]() Facilitation Decision Jam | ![]() Decision Making Assumption Surfacing | ![]() Operations A3 Problem Solving |
|---|---|---|---|---|
Purposedifferent | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 10-20 min daily | 60-90 min | 45-90 min | 45-90 min |
Participantsdifferent | 1 | 4-10 | 2-8 | 2-5 |
Formatdifferent | Async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Daily Plan, Time Estimates, Review Notes | Problem Cluster, Prioritized Challenge, Experiment | Assumption List, Critical Assumptions, Learning Plan | A3 Report, Action Plan, Root Cause Analysis |
Tagsno overlap | PlanningTime managementProductivityOperations | FacilitationDecisionProblem solvingWorkshop | AssumptionsRiskDecisionDiscovery | LeanProblem solvingCoachingOperations |



