methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowMediumLowLow
Timedifferent
10-20 min daily45-60 min1-2 Tage60-90 min
Participantsdifferent
12-81-44-12
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Daily Plan, Time Estimates, Review NotesAssumption map, Test backlog, Risk rankingArchitecture Document, Context View, Runtime View, Deployment ViewAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
PlanningTime managementProductivityOperations
AssumptionsRiskExperimentsValidation
ArchitectureDocumentationCommunication
RiskArchitectureWorkshopValidation
Add more methods