View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ALPEN Method | ![]() Operations A3 Problem Solving | ![]() Operations Kaizen Event | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Low | Medium | Medium | Low |
Timedifferent | 10-20 min daily | 45-90 min | 0.5-5 Tage | 15-30 min |
Participantsdifferent | 1 | 2-5 | 4-10 | 2-6 |
Formatdifferent | Async | Workshop + async | Workshop | Workshop |
Outputdifferent | Daily Plan, Time Estimates, Review Notes | A3 Report, Action Plan, Root Cause Analysis | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Root cause notes, Countermeasures |
Tagsno overlap | PlanningTime managementProductivityOperations | LeanProblem solvingCoachingOperations | LeanContinuous improvementOperations | Root causeIncidentLeanProblem solving |



