View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ALPEN Method | ![]() Operations 5 Whys | ![]() Operations Barrier Analysis | ![]() Operations MORT Analysis |
|---|---|---|---|---|
Purposedifferent | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. | For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps. |
Complexitydifferent | Low | Low | Medium | High |
Timedifferent | 10-20 min daily | 15-30 min | 2-4 h | Mehrere Tage bis Wochen |
Participantsdifferent | 1 | 2-6 | 2-6 | 2-6 |
Formatdifferent | Async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Daily Plan, Time Estimates, Review Notes | Root cause notes, Countermeasures | Barrier Inventory, Failure Analysis per Barrier, Action Backlog | MORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations |
Tagsno overlap | PlanningTime managementProductivityOperations | Root causeIncidentLeanProblem solving | Root causeSafetyIncident | Root causeSafetySystemicIncident |



