methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Purposedifferent
An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.
Complexitydifferent
LowMediumMediumMedium
Timedifferent
15-45 minlaufendOngoing10-30 min je Item
Participantsdifferent
1-32-122-121-8
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
ADR File, Decision Log, RationaleThroughput Data, Flow Forecast, Slicing RulesKanban board, WIP policies, Flow metricsThree-Point Estimate, Risk Range, Assumption Notes
Tagsno overlap
ArchitectureRationaleDocumentationGovernance
EstimationForecastingFlow
FlowVisual managementDelivery
EstimationUncertaintyForecasting
Add more methods