methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
LowLowHighLow
Timedifferent
15-45 min45-90 min2-4 h1-2 Tage
Participantsdifferent
1-33-123-81-4
Formatdifferent
AsyncWorkshopWorkshopWorkshop + async
Outputdifferent
ADR File, Decision Log, RationaleForce Field Map, Change Levers, Risk NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
ArchitectureRationaleDocumentationGovernance
ChangeDecisionStrategy
Theory of ConstraintsSystems thinkingChange
ArchitectureDocumentationCommunication
Add more methods