methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
LowHighHighLow
Timedifferent
15-45 min90-180 minSeveral meetings plus preparation and analysis; total effort depends on scope30-60 min
Participantsdifferent
1-33-8Evaluation team, architects, and relevant stakeholders3-10
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
ADR File, Decision Log, RationaleCoD Table, Prioritization SequencePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRisk Matrix, Top Risk List
Tagsno overlap
ArchitectureRationaleDocumentationGovernance
PrioritizationDeliveryEconomicsDecision
ArchitectureQualityRiskTradeoffsStakeholders
RiskDecisionPrioritizationAssessment
Add more methods