methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Architecture Communication Canvas method illustration showing its working structure
Architecture
Architecture Communication Canvas
Purposedifferent
An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The Architecture Communication Canvas plans architecture communication so the right people receive the right message. The method turns technical complexity into deliberate communication design.
Complexitydifferent
LowLowMediumMedium
Timedifferent
15-45 min1-2 TageOngoing60-120 min
Participantsdifferent
1-31-42-122-8
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
ADR File, Decision Log, RationaleArchitecture Document, Context View, Runtime View, Deployment ViewKanban board, WIP policies, Flow metricsCommunication Canvas, Stakeholder Messages, Architecture Communication Plan
Tagsno overlap
ArchitectureRationaleDocumentationGovernance
ArchitectureDocumentationCommunication
FlowVisual managementDelivery
ArchitectureCommunicationStakeholdersCanvas
Add more methods