methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowMediumHigh
Timedifferent
30-60 min30 min Setup, dann laufend0.5-5 TageSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-51-3 maintaining, briefing for everyone4-10Evaluation team, architects, and relevant stakeholders
Formatdifferent
AsyncAsyncWorkshopWorkshop + async
Outputdifferent
ABC Classification, Focus Rules, Control ListRAID Log, Status Report SourceKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdatePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
PrioritizationOperationsPortfolio
RiskTrackingStakeholdersGovernance
LeanContinuous improvementOperations
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods