View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Operations Kaizen Event | ![]() Operations DMAIC | ![]() Operations Gemba Walk |
|---|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 30-60 min | 0.5-5 Tage | 2-12 Wochen | 30-120 min |
Participantsdifferent | 1-5 | 4-10 | 3-10 | 2-6 |
Formatdifferent | Async | Workshop | Workshop + async | Workshop |
Outputdifferent | ABC Classification, Focus Rules, Control List | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Observation Notes, Improvement Ideas |
Tagsno overlap | PrioritizationOperationsPortfolio | LeanContinuous improvementOperations | Continuous improvementQualityProcess improvement | LeanObservationProcessOperations |



