methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
LowHighMediumHigh
Timedifferent
30-60 min2-4 h45-120 min2-6 h
Participantsdifferent
1-53-82-63-8
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
ABC Classification, Focus Rules, Control ListFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsChange Matrix, Cause Hypotheses, Validation Questions, Action ListCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
PrioritizationOperationsPortfolio
Theory of ConstraintsSystems thinkingChange
ChangeRoot causeTroubleshootingComparison
Systems thinkingRoot causeConstraintsCausality
Add more methods