methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Purposedifferent
With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.
Complexitydifferent
LowLowHighLow
Timedifferent
30-60 min45-90 min90-180 min1-2 h
Participantsdifferent
1-52-83-82-8
Formatdifferent
AsyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
ABC Classification, Focus Rules, Control ListAssumption List, Critical Assumptions, Learning PlanCoD Table, Prioritization SequenceDIBB document, Belief list, Bet list, Learning report
Tagsno overlap
PrioritizationOperationsPortfolio
AssumptionsRiskDecisionDiscovery
PrioritizationDeliveryEconomicsDecision
StrategyDecisionAssumptionsHypothesis
Add more methods