View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Operations 5 Whys | ![]() Operations Kepner-Tregoe |
|---|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. |
Complexitydifferent | Low | Medium | Low | High |
Timedifferent | 30-60 min | 2–4 h review as a planning range; preparation and evaluation additional | 15-30 min | 2-8 h |
Participantsdifferent | 1-5 | Designers, developers as users, and facilitation | 2-6 | 2-8 |
Formatdifferent | Async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | ABC Classification, Focus Rules, Control List | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Root cause notes, Countermeasures | Problem Analysis, Decision Analysis, Risk Plan |
Tagsno overlap | PrioritizationOperationsPortfolio | ArchitectureEngineeringFeedbackValidationTasks | Root causeIncidentLeanProblem solving | Problem solvingRoot causeDecisionOperations |



