methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
A paper-based illustration representing Service Blueprint with its core stages and visible working result.
UX Design
Service Blueprinting
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.When a service experience is spread across several touchpoints, it brings frontstage and backstage together. It shows where user contact and internal responsibility must fit.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighLowLow
Timedifferent
45-90 min0.5-2 Tage60-90 min15-30 min
Participantsdifferent
2-56-124-102-6
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
A3 Report, Action Plan, Root Cause AnalysisService Blueprint, Fail Points, Ownership MapProblem Cluster, Prioritized Challenge, ExperimentRoot cause notes, Countermeasures
Tagsno overlap
LeanProblem solvingCoachingOperations
Service designOperationsJourneyBlueprint
FacilitationDecisionProblem solvingWorkshop
Root causeIncidentLeanProblem solving
Add more methods