methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
45-90 minOngoing90-180 min2-8 h
Participantsdifferent
2-52-123-82-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
A3 Report, Action Plan, Root Cause AnalysisKanban board, WIP policies, Flow metricsCoD Table, Prioritization SequenceProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
LeanProblem solvingCoachingOperations
FlowVisual managementDelivery
PrioritizationDeliveryEconomicsDecision
Problem solvingRoot causeDecisionOperations
Add more methods