View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations A3 Problem Solving | ![]() Facilitation Decision Jam | ![]() Growth A/B Testing | ![]() Operations 5 Whys |
|---|---|---|---|---|
Purposedifferent | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. |
Complexitydifferent | Medium | Low | High | Low |
Timedifferent | 45-90 min | 60-90 min | 1-4 Wochen | 15-30 min |
Participantsdifferent | 2-5 | 4-10 | 1-6 | 2-6 |
Formatdifferent | Workshop + async | Workshop | Async | Workshop |
Outputdifferent | A3 Report, Action Plan, Root Cause Analysis | Problem Cluster, Prioritized Challenge, Experiment | Experiment results, Decision log, Learning summary | Root cause notes, Countermeasures |
Tagsno overlap | LeanProblem solvingCoachingOperations | FacilitationDecisionProblem solvingWorkshop | ExperimentsGrowthAnalyticsValidation | Root causeIncidentLeanProblem solving |



