methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighLowLow
Timedifferent
45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope30 min Setup, dann laufend15-30 min
Participantsdifferent
2-5Evaluation team, architects, and relevant stakeholders1-3 maintaining, briefing for everyone2-6
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncWorkshop
Outputdifferent
A3 Report, Action Plan, Root Cause AnalysisPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRAID Log, Status Report SourceRoot cause notes, Countermeasures
Tagsno overlap
LeanProblem solvingCoachingOperations
ArchitectureQualityRiskTradeoffsStakeholders
RiskTrackingStakeholdersGovernance
Root causeIncidentLeanProblem solving
Add more methods