View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation 1-2-4-All | ![]() Facilitation Alignment Mapping | ![]() Facilitation Mind Mapping | ![]() Facilitation Power Interest Grid |
|---|---|---|---|---|
Purposedifferent | When many people in a group too rarely get to speak, 1-2-4-All distributes thinking time more fairly. The format builds participation step by step and makes quiet or still-unformed thoughts usable faster. | When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable. | When a topic is still unclear and too many thoughts surface at once, Mind Mapping creates an open surface for ordering them. It makes connections, subtopics, and starting points visible without fixing them too early. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 10-20 min | 1-2 h | 15-45 min | 30-60 min |
Participantsdifferent | 4-100+ | 4-12 | 1-10 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Idea List, Shared Insights, Emergent Themes | Alignment Map, Open Issues, Decision Questions | Mind Map, Topic Clusters, Open Questions | Power Interest Grid, Strategy per Stakeholder |
Tags1 shared | FacilitationInclusionIdeation | AlignmentStakeholdersStrategyFacilitation | BrainstormingIdeasMappingStructureFacilitation | StakeholdersFacilitationAlignmentPlanning |



