methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
HighMediumLowMedium
Timedifferent
45-90 min1-3 Tage30-60 min1-2 h
Participantsdifferent
3-101-42-84-12
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsArchitecture Views, Cross-view Notes, RationalePower Interest Grid, Strategy per StakeholderAlignment Map, Open Issues, Decision Questions
Tagsno overlap
LeanEconomicsSequencePrioritization
DocumentationStakeholdersArchitecture
StakeholdersFacilitationAlignmentPlanning
AlignmentStakeholdersStrategyFacilitation
Add more methods