methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
HighLowHighLow
Timedifferent
45-90 min30 min Setup, dann laufendSeveral meetings plus preparation and analysis; total effort depends on scope15-45 min
Participantsdifferent
3-101-3 maintaining, briefing for everyoneEvaluation team, architects, and relevant stakeholders1-3
Formatdifferent
WorkshopAsyncWorkshop + asyncAsync
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsRAID Log, Status Report SourcePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsADR File, Decision Log, Rationale
Tagsno overlap
LeanEconomicsSequencePrioritization
RiskTrackingStakeholdersGovernance
ArchitectureQualityRiskTradeoffsStakeholders
ArchitectureRationaleDocumentationGovernance
Add more methods