methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighLowHighLow
Timedifferent
45-90 min20–45 min90-180 min30-60 min
Participantsdifferent
3-10Small cross-functional group3-83-10
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsRisk list, Mitigation plan, Assumption logCoD Table, Prioritization SequenceRisk Matrix, Top Risk List
Tagsno overlap
LeanEconomicsSequencePrioritization
RiskDecisionFailurePlanning
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
Add more methods