methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighLowLowHigh
Timedifferent
45-90 min20–45 min30-90 min90-180 min
Participantsdifferent
3-10Small cross-functional group2-83-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
PrioritizationDeliveryEconomicsDecision
Add more methods