methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighLowMediumLow
Timedifferent
45-90 min20–45 min45-60 min30-60 min
Participantsdifferent
3-10Small cross-functional group2-83-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsRisk list, Mitigation plan, Assumption logAssumption map, Test backlog, Risk rankingRisk Matrix, Top Risk List
Tagsno overlap
LeanEconomicsSequencePrioritization
RiskDecisionFailurePlanning
AssumptionsRiskExperimentsValidation
RiskDecisionPrioritizationAssessment
Add more methods