methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighMediumLowHigh
Timedifferent
45-90 minOngoing45-120 min90-180 min
Participantsdifferent
3-102-122-83-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsKanban board, WIP policies, Flow metricsWaste Map, Prioritized Waste, Improvement BacklogCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
FlowVisual managementDelivery
WasteLeanProcess improvement
PrioritizationDeliveryEconomicsDecision
Add more methods