methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of an IBIS map with issues, positions and arguments
Knowledge Modeling
IBIS
Paper illustration of a Concept Map with concepts and labelled links
Knowledge Modeling
Concept Mapping
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.IBIS structures thinking about complex questions as a sequence of issues, ideas, and arguments. The method keeps discussions open without forcing them into premature consensus.Concept Mapping arranges terms and relationships in a network that makes subject-matter connections tangible. It fits when a topic needs to be understood structurally rather than linearly.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighMediumMediumHigh
Timedifferent
45-90 min1-3 h1-2 h90-180 min
Participantsdifferent
3-102-81-83-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsIssue Map, Positions, Argument NotesConcept Map, Relationship Labels, Knowledge GapsCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
RationaleKnowledgeDecision
KnowledgeConceptsMappingSensemaking
PrioritizationDeliveryEconomicsDecision
Add more methods