methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighLowLowHigh
Timedifferent
45-90 min1-2 h30-60 min90-180 min
Participantsdifferent
3-102-83-103-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsDIBB document, Belief list, Bet list, Learning reportRisk Matrix, Top Risk ListCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
StrategyDecisionAssumptionsHypothesis
RiskDecisionPrioritizationAssessment
PrioritizationDeliveryEconomicsDecision
Add more methods