methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
HighLowHighLow
Timedifferent
45-90 min1-2 h90-180 min45-90 min
Participantsdifferent
3-102-83-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsDIBB document, Belief list, Bet list, Learning reportCoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
LeanEconomicsSequencePrioritization
StrategyDecisionAssumptionsHypothesis
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
Add more methods