Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
HighHighHighLow
Timedifferent
45-90 min90-180 minSeveral meetings plus preparation and analysis; total effort depends on scope45-90 min
Participantsdifferent
3-103-8Evaluation team, architects, and relevant stakeholders2-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization SequencePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
ArchitectureQualityRiskTradeoffsStakeholders
AssumptionsRiskDecisionDiscovery