methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighLowLowHigh
Timedifferent
45-90 min1-4 h15-45 min90-180 min
Participantsdifferent
3-101-51-33-8
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsContext Diagram, Container Diagram, Component DiagramADR File, Decision Log, RationaleCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
ArchitectureCommunicationVisualization
ArchitectureRationaleDocumentationGovernance
PrioritizationDeliveryEconomicsDecision
Add more methods