methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.
Complexitydifferent
HighLowLowLow
Timedifferent
45-90 min45-90 min20–45 min30-60 min
Participantsdifferent
3-102-8Small cross-functional group3-10
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsAssumption List, Critical Assumptions, Learning PlanRisk list, Mitigation plan, Assumption logRisk Matrix, Top Risk List
Tagsno overlap
LeanEconomicsSequencePrioritization
AssumptionsRiskDecisionDiscovery
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
Add more methods