methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighLowHighHigh
Timedifferent
45-90 min45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope90-180 min
Participantsdifferent
3-102-8Evaluation team, architects, and relevant stakeholders3-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsAssumption List, Critical Assumptions, Learning PlanPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
AssumptionsRiskDecisionDiscovery
ArchitectureQualityRiskTradeoffsStakeholders
PrioritizationDeliveryEconomicsDecision
Add more methods