methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of shared options, independently placed voting dots, and a highlighted shortlist.
Facilitation
Dot Voting
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When a workshop has produced too many options and the group needs to condense quickly, dot voting makes preferences visible in a short time. It bundles individual votes into a solid signal for the next selection.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
HighLowLowHigh
Timedifferent
45-90 min15-45 min5-15 min90-180 min
Participantsdifferent
3-101-33-203-8
Formatdifferent
WorkshopAsyncWorkshopWorkshop
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsADR File, Decision Log, RationaleRanked list, Consensus signal, ShortlistCoD Table, Prioritization Sequence
Tagsno overlap
LeanEconomicsSequencePrioritization
ArchitectureRationaleDocumentationGovernance
FacilitationVotingConsensusPrioritization
PrioritizationDeliveryEconomicsDecision
Add more methods