methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Purposedifferent
When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.
Complexitydifferent
HighLowHighMedium
Timedifferent
45-90 min15-30 min90-180 min45-90 min
Participantsdifferent
3-102-63-82-5
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Ranked Backlog, Cost-of-Delay AssumptionsRoot cause notes, CountermeasuresCoD Table, Prioritization SequenceA3 Report, Action Plan, Root Cause Analysis
Tagsno overlap
LeanEconomicsSequencePrioritization
Root causeIncidentLeanProblem solving
PrioritizationDeliveryEconomicsDecision
LeanProblem solvingCoachingOperations
Add more methods