View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Wideband Delphi | ![]() Operations Fault Tree Analysis | ![]() Facilitation Dot Estimation | ![]() Operations Barrier Analysis |
|---|---|---|---|---|
Purposedifferent | A single opinion rarely holds up for planning when the future is genuinely uncertain. It separates options, evaluation criteria, and open risks. The result is captured as an Estimate Range, Assumption Log, and Expert Consensus Notes. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. |
Complexitydifferent | High | High | Low | Medium |
Timedifferent | 1-4 h or multiple rounds | 2-6 h | 5-20 min | 2-4 h |
Participantsdifferent | 4-12 Experten | 3-8 | 3-20 | 2-6 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Estimate Range, Assumption Log, Expert Consensus Notes | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Effort Heatmap, Risk Signals, Discussion Targets | Barrier Inventory, Failure Analysis per Barrier, Action Backlog |
Tagsno overlap | EstimationExpertsForecasting | RiskRoot causeSafety | EstimationEffortRisk | Root causeSafetyIncident |



