View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Waste Analysis | ![]() Facilitation Dot Estimation | ![]() Operations Root Cause Tree Analysis | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | For a problem with several suspected causes, the method builds a causal structure instead of a mere list. It makes visible how causes connect and where the strongest points of leverage lie. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Low | Low | Medium | High |
Timedifferent | 45-120 min | 5-20 min | 1-3 h | 2-6 h |
Participantsdifferent | 2-8 | 3-20 | 2-8 | 3-10 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Waste Map, Prioritized Waste, Improvement Backlog | Effort Heatmap, Risk Signals, Discussion Targets | Cause Tree, Evidence Notes, Countermeasures | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | WasteLeanProcess improvement | EstimationEffortRisk | Root causeTreeIncidentQuality | RiskQualityOperationsRoot cause |



