View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Waste Analysis | ![]() Operations ABC Analysis | ![]() Operations DMAIC | ![]() Operations Fishbone Diagram |
|---|---|---|---|---|
Purposedifferent | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. |
Complexitydifferent | Low | Low | High | Low |
Timedifferent | 45-120 min | 30-60 min | 2-12 Wochen | 30-60 min |
Participantsdifferent | 2-8 | 1-5 | 3-10 | 2-8 |
Formatdifferent | Workshop | Async | Workshop + async | Workshop |
Outputdifferent | Waste Map, Prioritized Waste, Improvement Backlog | ABC Classification, Focus Rules, Control List | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Fishbone Diagram, Cause Categories, Investigation Backlog |
Tagsno overlap | WasteLeanProcess improvement | PrioritizationOperationsPortfolio | Continuous improvementQualityProcess improvement | Root causeQualityOperations |



