View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Visual Management | ![]() Operations PDCA Cycle | ![]() Innovation Design Charrette | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | With high tempo and many parallel topics, the method makes status, deviations, and priorities visible at a glance. It reduces search effort and prevents what matters from getting lost in daily work. | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | In a tightly timed design process with many participants, the method pools several lines of thinking in a short time. It brings parallel design energy without letting the discussion tip into endless coordination. This quickly produces solid directions for architecture or space. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Low | Low | Medium | Medium |
Timedifferent | Ongoing | 1 h bis mehrere Wochen | Halber Tag bis mehrere Tage | 0.5-5 Tage |
Participantsdifferent | 1-20 | 1-8 | 10-50 | 4-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | Visual Board, Status Indicators, Exception Cues | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Sketches and Concepts, Consolidated Solution Sketch, Prioritized Direction | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | SignalsOperationsVisual management | Continuous improvementLeanExperiments | BrainstormingWorkshopCollaborationIdeation | LeanContinuous improvementOperations |



